Every project on this page is real work. We name a client only where it has been agreed, and every photograph is captioned with what the work was.
Showing all 25 projects
Globe Industrial Park, Dukinfield: operative in the platform basket carrying out repairs at the top of the elevation, our access platform belowRepairs at the top of a unit elevation, carried out from our own van-mounted aerial work platform.
Wavertree Retail Park: operative in the access platform basket painting the Welcome to Wavertree Retail Park entrance signSign painting at the Wavertree Retail Park entrance sign, and access platform work at a lamp column in a retail park car park.
Origin Kicks, Trafford Centre, Manchester: arched burgundy niches, fluted white counter and polished dark floor tiles in the finished fit-outFull fit-out of the Origin Kicks store, unit 145: bespoke joinery, illuminated display counter, arched niches and LED lightboxes.
Elk Mill Shopping Park, Oldham: the steel railing along the bank after repainting in blackRailings prepared and repainted, knee rails maintained and repaired, and ACO channel drains cleared.
Next, Yorkshire: scaffold tower at the column entrance during an emergency call-out for loose brickwork, August 2026Emergency call-out for loose brickwork at the column entrance, August 2026.
Kurt Geiger store: the finished corner and shop frontageDamaged canopy fascia corner measured, repaired and finished.
Cheetham Hill retail park: breaking out the old kerb line with a breakerThe old kerb broken out and a new kerb line laid.
Bollard installation at a Greater Manchester bus interchange: operatives working behind chapter 8 barriersSteel bollards installed at a pedestrian entrance, behind chapter 8 barriers.
Bold St. Pavilion marketing suite, Old Trafford: finished hard landscaping with clean white gravel, timber sleeper borders and black plantersTimber sleeper borders set level and white decorative gravel laid at a marketing suite.
Groundworks outside the Destination Padel unit: micro digger and operatives working behind chapter 8 barriersGroundworks with a micro digger behind chapter 8 barriers.
BBC, St Peter’s Square, Leeds: earth-rod cover raised level with the paving, January 2026Groundworks in November 2024, then five earth-rod covers raised level with the paving in January 2026.
High-level work from a truck-mounted access platform on a multi-storey office blockWork at height from a truck-mounted access platform.
Hilton hotel, Manchester: new composite decking and seating around the planted treesNew composite decking and seating around the planted trees, completed February 2025.
Manchester Airport: office area, photographed during our continued services, December 2024Continued services at Manchester Airport, December 2024.
Drainage: a new ACO channel set in a concrete pour at night, beside a micro diggerNew ACO channel set in concrete, with a micro digger on site.
Loft office refurbishment: the fitted boardroom, with green feature walls beyondGreen feature walls, painted exposed beams and a fitted boardroom.
Mezzanine office fit-out: the finished seating areaA mezzanine office, during the works and finished.
Front renovation for Kurt Geiger at Cheshire Oaks, July 2025.
Copthorne hotel: access platform at the four-storey elevation during the gutter cleanFour storeys, a RAMS written to reach every gutter, and a contract won.
Alder Hey, Liverpool: water-fed pole on the building cladding during the two-day handover clean, October 2026Water-fed-pole cleaning of windows and cladding, with a photographic report.
Bury bus station: solar lamp post installed for a zebra crossing, November 2024Three solar lamp posts installed for the zebra crossings, November 2024.
Trafford Park: accessible washroom after full refurbishment, one of four toilets completedFour toilets fully refurbished for a health and safety company.
Assemblies of God GB, Manchester: car park after weeding and cleaning, October 2026Repeat maintenance, a six-monthly gutter and window clean, and a car park clean in October 2026.
Altrincham Retail Park: replacement knee-rail post, October 2026Four rotten knee-rail posts replaced, completion photographs sent 21 October 2026.
Stonebridge, Liverpool: gutter after clearance, one of five industrial units, October 2026Gutters cleared across five units on 14 October 2026.
Send a brief or a site address. We will confirm scope and come back with a clear price.