The Hilton hotel asked for its exterior to look more appealing. The timber decking and seating around the planted trees had rotted, and was to be replaced with composite decking.
When the building manager reported that boards were uneven following later electrical works, we attended on 25 February 2025, re-aligned them and met the hotel’s manager on site, who confirmed he was happy.





Accreditation evidence supplied for site registration.
Issued before attendance.
Every job closed with dated photographs.
Elk Mill Shopping Park, Oldham: the steel railing along the bank after repainting in blackRailings prepared and repainted, knee rails maintained and repaired, and ACO channel drains cleared.
Cheetham Hill retail park: breaking out the old kerb line with a breakerThe old kerb broken out and a new kerb line laid.
Bollard installation at a Greater Manchester bus interchange: operatives working behind chapter 8 barriersSteel bollards installed at a pedestrian entrance, behind chapter 8 barriers.