We installed steel bollards at a pedestrian entrance to a Greater Manchester bus interchange. The works were carried out in a barriered work area on the pavement, with buses passing alongside.
On a live public site the barriers and the working method matter as much as the finished bollards: the people using the entrance and the buses next to it keep moving while the work is done safely.






Accreditation evidence supplied for site registration.
Issued before attendance.
Every job closed with dated photographs.
Elk Mill Shopping Park, Oldham: the steel railing along the bank after repainting in blackRailings prepared and repainted, knee rails maintained and repaired, and ACO channel drains cleared.
Cheetham Hill retail park: breaking out the old kerb line with a breakerThe old kerb broken out and a new kerb line laid.
Bold St. Pavilion marketing suite, Old Trafford: finished hard landscaping with clean white gravel, timber sleeper borders and black plantersTimber sleeper borders set level and white decorative gravel laid at a marketing suite.
Send a brief or a site address. We will confirm scope and come back with a clear price.