Groundworks and earth-rod cover works at BBC premises in Leeds; three solar lamp posts at Bury bus station; replacement knee-rail posts at Altrincham Retail Park; railing repainting, knee rail repairs and ACO channel drain clearance at Elk Mill Shopping Park in Oldham; and composite decking at the Hilton hotel in Manchester.
Groundworks outside a Destination Padel unit, with a micro digger working behind chapter 8 barriers (case study); hard landscaping at the Bold St. Pavilion marketing suite in Old Trafford, with timber sleeper borders and white decorative gravel (case study); white line marking on block paving and in a car park; and yellow anti-slip step nosings with galvanised handrails on external steps.
Kerb replacement at a retail park in Cheetham Hill (case study); new ACO channel drains set in concrete (case study); and steel bollard installation at a Greater Manchester bus interchange (case study).
See the work: Cheetham Hill kerb replacement · ACO channel installation · Bus interchange bollards · Bold St. Pavilion, Old Trafford · Destination Padel groundworks · Elk Mill Shopping Park, Oldham · Bury bus station · BBC, Leeds · Altrincham Retail Park












Send a brief or a site address. We will confirm scope and come back with a clear price.