Excavation, ducting and external works beside the main entrance in November 2024, then a reset of sunken earth-rod covers around the building in January 2026.
Level, safe paving around the covers on a public-facing site, and a repeat instruction.





Accreditation evidence supplied for site registration.
Issued before attendance.
Every job closed with dated photographs.
Elk Mill Shopping Park, Oldham: the steel railing along the bank after repainting in blackRailings prepared and repainted, knee rails maintained and repaired, and ACO channel drains cleared.
Cheetham Hill retail park: breaking out the old kerb line with a breakerThe old kerb broken out and a new kerb line laid.
Bollard installation at a Greater Manchester bus interchange: operatives working behind chapter 8 barriersSteel bollards installed at a pedestrian entrance, behind chapter 8 barriers.
Send a brief or a site address. We will confirm scope and come back with a clear price.