We broke out the old kerb with a breaker, in a barriered work area beside the road, and laid a new kerb line.





Accreditation evidence supplied for site registration.
Issued before attendance.
Every job closed with dated photographs.
Elk Mill Shopping Park, Oldham: the steel railing along the bank after repainting in blackRailings prepared and repainted, knee rails maintained and repaired, and ACO channel drains cleared.
Bollard installation at a Greater Manchester bus interchange: operatives working behind chapter 8 barriersSteel bollards installed at a pedestrian entrance, behind chapter 8 barriers.
Bold St. Pavilion marketing suite, Old Trafford: finished hard landscaping with clean white gravel, timber sleeper borders and black plantersTimber sleeper borders set level and white decorative gravel laid at a marketing suite.
Send a brief or a site address. We will confirm scope and come back with a clear price.