We installed new ACO channel drains set in concrete, using a micro digger for the excavation. One pour was carried out at night; the other channel runs across a service yard beside a retaining wall.






Accreditation evidence supplied for site registration.
Issued before attendance.
Every job closed with dated photographs.
Elk Mill Shopping Park, Oldham: the steel railing along the bank after repainting in blackRailings prepared and repainted, knee rails maintained and repaired, and ACO channel drains cleared.
Cheetham Hill retail park: breaking out the old kerb line with a breakerThe old kerb broken out and a new kerb line laid.
Bollard installation at a Greater Manchester bus interchange: operatives working behind chapter 8 barriersSteel bollards installed at a pedestrian entrance, behind chapter 8 barriers.