Shop fit-outs, full renovations and reactive maintenance, with every building trade under one roof. One accountable contractor for facilities managers, main contractors and estates teams, documented from the first call to the last photograph.
24/7 reactive line 01565 740714

Estates and FM teams do not want to manage ten trades. We cover the building trades under one roof, delivered by our own operatives and by vetted specialist partners for regulated work such as electrical certification and licensed asbestos.
You get one contractor, one point of contact and one set of paperwork, whether the job is a shop fit-out, a full renovation or a leak at two in the morning.
Origin Kicks, Trafford Centre: LED lightbox panels and LED-lit shelving bays beside the display counterRetail and commercial units fitted out to your drawings, programmed around trading and handed over with a snag list.
Read more
Trafford Park: accessible washroom after full refurbishment, one of four toilets completedStrip-out to handover under one project manager, occupied or void.
Read more
Next, Yorkshire: working from the scaffold tower on the loose brickwork at the column entrance, August 2026Attendance when something fails, 24 hours a day. Make safe first, then repair.
Read more
Hilton hotel, Manchester: new composite decking and seating around the planted treesJoinery, plumbing, decoration, gutter repairs, glazing, brickwork and general repairs.
Read more
Copthorne hotel: access platform at the four-storey elevation during the gutter cleanCommercial external window cleaning, gutter clearance, cladding and car park cleaning.
Read more
Bury bus station: solar lamp post installed for a zebra crossing, November 2024Surfacing, kerbs, ducting, lamp posts, line marking, fencing and signage.
Read moreAlso: planned maintenance and project management · compliance testing (asbestos, legionella, electrical) · waste and site clearance
A full shop fit-out of unit 145: bespoke fluted joinery, an illuminated glass display counter, arched burgundy niches with shelving and lighting, LED lightboxes and a feature bulkhead.
One contractor, every trade, from the 1:50 drawing to handover.
View the project Shop fit-outs
A dependable supply-chain partner for your clients.
Specialist maintenance and external works, fully inducted.
Fit-outs and maintenance that keep car parks and frontages trading.
Many units, many occupiers, one standard.
Site maintenance across car parks, common areas and units, under one coordinator.
Careful, documented work on healthcare sites.
Procurement-ready, with the evidence prepared.
Renovations and repairs for housing providers.
Reliable work in occupied buildings.
Every project below is real work, captioned with what the work was.
Globe Industrial Park, Dukinfield: operative in the platform basket carrying out repairs at the top of the elevation, our access platform belowRepairs at the top of a unit elevation, carried out from our own van-mounted aerial work platform.
Wavertree Retail Park: operative in the access platform basket painting the Welcome to Wavertree Retail Park entrance signSign painting at the Wavertree Retail Park entrance sign, and access platform work at a lamp column in a retail park car park.
Next, Yorkshire: scaffold tower at the column entrance during an emergency call-out for loose brickwork, August 2026Emergency call-out for loose brickwork at the column entrance, August 2026.
Kurt Geiger store: the finished corner and shop frontageDamaged canopy fascia corner measured, repaired and finished.
Elk Mill Shopping Park, Oldham: the steel railing along the bank after repainting in blackRailings prepared and repainted, knee rails maintained and repaired, and ACO channel drains cleared.
Cheetham Hill retail park: breaking out the old kerb line with a breakerThe old kerb broken out and a new kerb line laid.
Bollard installation at a Greater Manchester bus interchange: operatives working behind chapter 8 barriersSteel bollards installed at a pedestrian entrance, behind chapter 8 barriers.
High-level work from a truck-mounted access platform on a multi-storey office blockWork at height from a truck-mounted access platform.
BBC, St Peter’s Square, Leeds: earth-rod cover raised level with the paving, January 2026Groundworks in November 2024, then five earth-rod covers raised level with the paving in January 2026.
Email, phone or portal. We confirm scope, priority and access in writing.
Job-specific RAMS, insurances and any permits issued before we attend.
Our own operatives and vetted partners, supervised, working around your occupiers.
Photographs, job reference and completion note. Extra work is agreed before it starts.
CHAS Elite accreditation, job-specific RAMS, £10m employers’ liability and £5m public liability cover and a named onboarding contact mean your supplier approval does not stall.
Alysia in our office handles onboarding paperwork so your team gets complete documents the first time.
View accreditations Request the supplier pack
CHAS member 175164.

Certificate on file.
Send a brief or a site address. We will confirm scope and come back with a clear price.